Melbourne Airport Terminal 4 – Hoarding

Location: Tullamarine Airport

Contractor: Leighton Contractors

The scope of works for this project was to design and construct an engineered internal panel system to withstand external wind loadings during alterations to Terminal 4. Works were completed at night by Airport Security Identification Card (ASIC) holders and we complied with the Airport’s approved materials and fixing methods.Working with our engineers, Lee Group designed a clamped bracket system to enable practical application in the ceiling space, allowing maximum flexibility around complicated services layout and infrastructure.