EHS installed approximately 100 l/m @up to 3.6mtr high Timber Hoarding systems, cantilevered at Highpoint for 3 different shop frontages until each premises gained their own food premises permit.
This innovative design covering approximately 340m2 required a team of 6 Lee Group workers on the job over 19 hours to install only, and once their permits were issued it was only days that the hoarding could be removed and cleaned up ready for the premises to be open.
The Interlock Hoarding system was perfect for this particular application as it required no permanent fixings to the newly polished floors and newly painted ceilings – this was the most important factor for our client and the reason why our product dominated and was most appropriate.
The system also meant Highpoint had a neat and ascetically pleasing façade for local shoppers and passing customers.